Many commentators have said that the new NPPF has clear focus on accelerating housing delivery. Concern has been expressed by some that it therefore provides weaker protection for the natural environment. However, the roles that green infrastructure, open space and access to nature have to play in new development itself is clearly recognised, with crossovers into policies relating to the promotion of healthy communities, the conservation and enhancement of the natural environment and the design of connecting public access routes into surrounding land.
There is also emphasis on development where cycling and walking provision can deliver active and sustainable travel. Specifically, there is to be new development around well-connected railway stations, with a distance of around 800 metres, or a walking time of approximately ten minutes, defining what is a ‘reasonable walking distance’ between a development and a station. Interestingly in the context of the “Promoting healthy communities” policy HC5, preventing hot food takeaways from being close to schools and places where children and young people congregate, ‘a reasonable walking distance’ is defined as only 400 metres or five minutes walking time.
All of the above, and much more, will of course need to be balanced by highway and planning authorities and, perhaps to assist with this, there is the introduction of a policy specifically for public rights of way: TR8, published within the chapter “Promoting sustainable transport”. While the NPPF has no impact on existing public rights of way legislation, TR8 provides a new context for consideration of the network when development is proposed. It replaces the statement in the previous NPPF (paragraph 105): “Planning policies and decisions should protect and enhance public rights of way and access, including taking opportunities to provide better facilities for users, for example by adding links to existing rights of way networks including National Trails.”
Is TR8 good new for developers?
“TR8: Public Rights of Way
Development proposals should:
- Protect and enhance the network of public rights of way, including through suitable diversions agreed with the highway authority;”
This specific reference to diversions can be seen as an acknowledgement that changes to the network are to take place; a plus for developers where diversions are often resisted by local or national user groups. In addition, encouragement to engage with the highway authority, rather than the planning authority, in respect of changes to the network, can be seen to reflect that the prime authorities with the resource and the policies to consider the network are the highway authorities. Planning authorities can struggle to deal with applications made to them under s257 of the Town & Country Planning Act 1990 for diversion (or stopping up and alternative route) orders to implement planning permissions, causing considerable delay and expense for developers. While the highway authority would not be empowered to make such an order without specific agreement with the authority granting the planning permission, this provision can be seen as also opening the door for more applications to the Department of Transport, for orders to be made under s247 of the same Act to enable development to proceed more speedily.
- “Take opportunities to extend, link or improve the quality of existing routes where this enables one or more of the following:
- Improved access to green spaces and the countryside;
- New direct and circular routes and connections between local and long-distance footpaths, bridleways and cycle routes;
- The provision of accessible, safe and convenient links to services and facilities;
- Improved connections with public transport stops and interchanges.”
This wording reflects the previous NPPF requirement to ‘take opportunities’ to provide better facilities and new links to the network but is more specific as to the purpose that the new links and improvements are to serve. This may well be helpful to developers in identifying what they should be aiming to include and on the provision to be made in a site for public access in its different forms.
Overall, the message to developers has to be to consider public rights of way, and broader public access, as early as possible when preparing development proposals. Designing a route into a layout has to remain the most efficient way to deal with an existing route, but perhaps now there is more emphasis on what is going on beyond the red line site boundary for developers to bear in mind when producing layouts. Where routes do need to be created, diverted or stopped up a developer may also find that local authorities are better placed to assist with deducing viable proposals for orders and creation agreements, with the highway authority’s leading role clearly identified. This must be good news.
TR8 is a policy that developers should find they can work with.
Carol Ramsden is a Consultant in the Planning and Environment Team, a fellow of IPROW and a member of Defra’s National Stakeholder Working Group on Public Rights of Way, as a landowner representative. She acts regularly for developers and is very experienced in achieving changes to the public rights of way network to enable development to proceed.
Audio versions of this article are autogenerated and occasional errors in interpretation may be made. The content of this article is for general information only. It is not, and should not be taken as, legal advice. If you require any further information in relation to this article, please contact the author in the first instance. Law covered as at October 2026.